Selected work / 01—09
Marketing site live
STKY
The costliest position on a Czech shop floor is the one nobody applied for.
- Web


01 / The story
What I built. — STKY
I lead STKY, bringing AI and automation into Czech manufacturing. We start with a five-day operating audit and choose one pilot with an agreed success measure. The four tracks cover predictive maintenance, administration, computer-vision quality control and production planning.
I shaped and built the marketing site around that process. Visitors move through a factory line from the audit to each automation track. TanStack Start and Tailwind handle the site, GSAP controls the scroll sequence, and React Three Fiber renders the factory scene. Supported browsers use an OffscreenCanvas path.
We work with the inputs factories already have: spreadsheets, PLC exports and photographs of whiteboards. The pilot has to prove itself against a number the operator can check.
02 / Evidence
The proof. — STKY
- 015 site stations — an audit plus 4 automation tracks
- 02A 5-day audit before anything is built
- 03Published model: about CZK 1.8M annual employer cost for one three-shift role
03 / Delivery
What I delivered. — STKY
- Role
- Company lead — product direction, design and build
- Platforms
- Web
- Current status
- Marketing site live
- Built with
- TypeScript / TanStack Start / Tailwind CSS / GSAP / React Three Fiber
Live links
Let’s get yours shipped.
Talk about your project